Stage Two: the tasks
1.
cover the roof in sealant
2.
build a bathroom on the top floor
3.
re-plumb the whole house from top to bottom
4.
re-tile the downstairs loo, build a door to hide the pump and build a gutter
5.
move the door to the patio 20 cm to the left and replace with a pair of iron-framed french doors
6.
Fix various bits and bobs like the first-floor gutters and the threshold in my study
7.
Replace door handle kitchen
8.
Clean and repaint the bedroom ceiling.